References

Rigel Sistemi reference list

YearUserNationProjectDescription
2017 AL QABAS OIL SERVICESIRAQAl Mansoriya Water
Treatment Project
DESIGN AND SUPPLY OF :
- Ultrasonic Flow Meters Flanged
- Flow Meter for Air - Backwash
- Electronic recorders
- Ultrasonic Level Meters
- pH/ORP Liquid Analysis Transmitter
- Chlorine Liquid Analysis Transmitter
- Stand Alone Support
- Electronic Recorder 5 pen (Used for Water Quality
- Level Switch
- Pressure Transmitters
- Air Blowers (including enclosure)
- Call System
- Telephone System
- Data Transmission System
- Filter Desk
- Low Voltage Distribution Board
- High Lift Pumps House
- Filter Building Sub-board
- Sludge PIT Sub-board
- Low Lift station Main Distribution Board
- Treatment Plant Instrument Panel & Mimic
Diagram
- Low Lift Station Instrument Panel & Mimic Diagram
- Engineering, drawings and labelling
2017 KENIA PIPELINE Co .LTD KENYAKPC DEPOTS – AUTOMATION OF PROCESS
VALVES
Control and management of the pipeline through the
implementation of electric actuators , currently manual ,
along pipeline and in the Depots.:
-Supply of electric Actuators
- Design, supply install test and commissioning Fiber
Optic
- Design, supply, install, test and commissioning an
integrated control system, PLC based , to supervise
and control (PS14KOSF)and(PS15 SOT)
- Supply, install, integrate and commission the new I/O
modules in the existing PLC to realize the automation
of valves
- Upgrade MI graphics on existing HMIs and
Workstations to of respective pump stations to
integrate the new automatized valves.
- Develop and realize precise mechanics joints to fit
the Actuators on existing manually operated Valves
spindles
- Supply, excavation, laying and connection of Power
and Control Cables of the new actuators from valves
to control/power cabinets
2017 AL QABAS OIL SERVICESIRAQL.V. M.V. Boards & Transf for Al Sada &
Al Gobor WTP
DESIGN AND SUPPLY OF :
- TP Low Voltage Distribution Board LVDB-HL
- High Lift Pumps House MCC-6
- Filter Building Sub-board MCC-4
- Sludge PIT Sub-board MCC 7
- Chemical Building Main Sub-Board MCC 5
- Aluminum Room Sub –Board MCC 5/1
- Chlorination Room Sub Board MCC 5/2
- Flash Mixer Sub Board MCC-2
- Low Lift station Main Distribution Board LVDB-LL
- Low Lift Pumps MCC-1
- TP Mimic Panel
- LL Mimic Panel
- Engineering, drawings and labelling
2016ORASCOM CONSTRUCTION INDUSTRIES EGYPTNEW CAPITAL
Combined Cycle Power Plant Project 48000MW
DESIGN AND SUPPLY OF:
- Pressure Engineering
2016CCEDE IMPIANTI ITALIA SpAIRANP1534 SHELL SDA PROJECTDESIGN AND SUPPLY OF:
- Fuel Gas Valves Skids with control
- Instrumentation
- Installation material for hook-up, electrical and pneumatic
- Cables and junction boxes
- Accessory material for instrumentation
- Engineering
2016ACCEDE IMPIANTI ITALIA SpAIRAQWEST QURNA 2DESIGN AND SUPPLY OF:
- Fuel gas skids with control system
- Instrument on heater
- Local panel
- Aircraft warning light system
- Engineering
2016REPUBLIC OF IRAQ - MINISTRY OF OIL –
SOUTH REFINERY COMPANY (SRC)
IRAQEP OF CRUDE OIL TANKS AND PUMPS174/2014 DESIGN & SUPPLYING STORAGE TANKS AND SUPPLY PUMPS (EP)PROJECT
2016SEC - Saudi Electricity Company SAUDI ARABIAREPLACEMENT OF ESP TRANSFORMER AT RABIGH POWER PLANTEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR :
- N°48 ESP (electrostatic precipitation) transformer
- N°48 Control panel for ESP System
- Supply of power and control cable
- Supply of cable trays
2015KPE - KIMIA PETROCHEMICAL ENGINEERINGIRANARAK PETROCHEMICALREPLACEMENT OF ANALYZER FOR PETROCHEMICAL PLANT, EP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR:
- N° 1 Conditionid Liquid System
- N° 1 Analyzer box complete of PH, Conductivity and Silica analyzer
- Bulk installation material
2015SEC - Saudi Electricity Company SAUDI ARABIAREPLACEMENT OF ASH HANDLING COMPRESSOR AT RABIGH POWER PLANTEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR :
- N°2 Air compressor with integrated air dryer for ash handling system
- Interconnection piping and fittings between 2 unit
2015SCOP - MINISTRY OF OIL IRAQFAO TANKDESIGN AND SUPPLY FLOATING ROOF CRUDE OIL TANK AND ACCESSORIES
2015SEC - Saudi Electricity Company SAUDI ARABIAQURAYYAH POWER PLANTREPLACEMENT OF ANALYZER FOR STEAM TURBINE, DESALINATION UNIT, DEMINERALIZATION UNIT, EP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR:
- N° 4 ANALYZER RACK FOR STEAM TURBINE
- N° 3 ANALYZER RACK FOR DESALINATION UNIT
- N° 8 ANALYZER FOR DEMINERALIZATION UNIT
- BULK MATERIAL FOR INSTALLATION
2015LINDE IMPIANTI ITALIA S.R.L.IRAQWEST QURNADESIGN AND SUPPLY OF:
- Fuel Gas Skid
- Installation material for hook-up, electrical and pneumatic
- Cables and junction boxes
- Accessory material for instrumentation
- Engineering
2014SONATRACH ALGERIEMETERING SYSTEMEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP OF METERING SKIDS FOR EL GOLEA, ILLIZI, IN AMENAS:
- N°3 PLC GE PAC8000
- N°3 Gasoil skids pipe 4”
- N°3 Water skids pipe 2”
2013M&C GROUP / SCOP - MINISTRY OF OIL IRAQKIRKUK PLANTCONTROL PANELS FOR KIRKUK METERING SKIDSSUPPLY OF:
- Control cabinet for SKID
- P.L.C. + SW
- Cabinet
- Flow computers
- Monitor, PC, Printer
2013M&C GROUP / SCOP - MINISTRY OF OIL IRAQSHOAIBA – KARKHSUPPLY OF:
- Pressure gauges
- Electrical board for density skid
- Pressure transmitters
- Boxes for pressuredensity signal skid cable glands
- Boxes common multidrop signal transmission
- Galvanized steel wire armoured cable
- Slicing tool machine
- Junction boxes
2013SONATRACH ALGERIEGASOIL & WATER SKIDS EP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP OF SKIDS WITH FIELD INSTRUMENTATIONS, INSTALLATION MATERIALS, LOCAL PANELS AND ACCESSORIES:
- N°2 Gasoil skids pipe 4”
- N°2 Water skids pipe 2”
2012ISAB ITALYOXYGEN INJECTION SKID & SPARGERSUPPLY OF OXYGEN INJECTION SKID AND SPARGER FOR HOT INSTALLATION ON 36” AIR PIPE
SUPPLY OF:
- Oxygen injection skid
- Electronic transmitters
- Control valves
- On/Off valves
- Solenoid valves
- Gauge
- Thermocouple
- Cables
- Junction boxes
- Piping Material
- Manual valves
- Coriolis flow transmitter
- Instrument manifold
- Compression fittings
- Flow orifice
- Engineering
- Supervision and installation
2011BDS IMPORT AND EXPORT ENGLANDCHEMICAL PLANT – CA PLANTEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR:
- N°1 Yokogawa Centum VP
- N°1 PLC ESD HIMA
2011PROGETTI INDIA ENGINEERING LLC OMAN SEC METERING UPGRADATION FOR RABIGH & SHOAIBAEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR:
- N°2 Metering
- N°5 C.O. + N°4 H.F.O. RABIGH pipe 12”
- N°5 C.O. + N°4 H.F.O. SHOAIBA pipe 16”
- N°1 GE PAC8000
- N°1 CITECT SCADA
- N°1 OMNI Flow computer
2010SCOP - MINISTRY OF OIL IRAQFIRE FIGHTING SYSTEM FOR FAO DEPOTEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR:
- Fire fighting system FM200
2009KHAIRY HEMAYEM CO. IRAQWATER TREATMENT PLANTEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP OFWATER TREATMENT PLANT OF 2000m3/h FOR ABU GHARAIBINCLUDING:
- LV DISTRIBUTION
- 11KV/33KV MAIN TRANSFORMER BOARD
2009SOPES ITALYPORTO EMPEDOCLE PLANTEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP OF REVERSE OSMOSI DESALINATION PLANT CONTROL SYSTEM AND EQUIPMENTS
2009SCOP - MINISTRY OF OIL IRAQSTEEL TANKS FOR SRCEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP OF n°9 STEEL STORAGE TANKS INCLUDING FIELD EQUIPMENTS
2009AL QABAS OIL – JORDAN IRAQMUFTIYA WATER PROJECTEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR WATER TREATMENT PLANT OF 2000m3/h COMPLETE INSTRUMENTATION WITH MECHANICAL, ELECTRICAL AND PIPES MATERIALS :
- DCS ABB AC800F
- N°6 First lift pumps 1100 m3/h
- N°4 Intermediate pumps 1100 m3/h
- N°4 Second lift pumps 1100 m3/h
- N°4 Second lift pumps 500 m3/h
2009SCOP - MINISTRY OF OIL IRAQBAIJI, DAYALA, LATUFETA, HAMMAN AL ALIL, NASSIRIYA & RUSAFA LOADING/ UNLOADING FACILITIES & DRAINAGE VESSELS EP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR:
RUSAFA
- N°1 Loading pump 48m3/h - 4.3bar
- N°1 Loading bay 6”

NASSIRYA
 N°3 Loading pump 50m3/h – 3.5bar
 N°6 Unloading pumps 23m3/h – 5bar
 N°3 Loading bay 6”

LATIFIYA
 N°4 Loading pump 50m3/h – 4.7bar
 N°4 Unloading pumps 23m3/h – 5bar
 N°1 Drain pumps 6m3/h – 5bar
 N°1 Fire water pumps 500m3/h – 12bar
 N°4 Loading bay 6”
 N°1 Jockey fire fighting pump 50m3/h – 7bar
 N°1 Fire water pump 500m3/h – 12bar

HAMMAM AL ALIL
 N°10 Loading pump 43m3/h – 4.7bar
 N°10 Loading bay 4”
 N°1 Drain pump 6m3/h – 5bar
 N°1 DCS ABB AC800F

DAYALA
 N°2 Unloading pump 23m3/h – 5bar
2009SCOP - MINISTRY OF OIL IRAQNAJAF OIL STORAGE DEPOTEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR:
- N°4 Load pumps gasoline 30m3/h out 4Kg/cm2
- N°3 Load pumps kerosene 35m3/h out 4Kg/cm2
- N°3 Load pumps gasoline 30m3/h out 4,5Kg/cm2
- N°1 Load slop pump 30m3/h out 4Kg/cm2
- N°1 Load pump benzene 30m3/h out 4Kg/cm2
- N°1 Transfer slop pump 16m3/h out 6,5Kg/cm2
- N°1 Loading pump drain 5m3/h out 3.5Kg/cm2
- N°1 Load pump benzene 110m3/h out 5,5Kg/cm2
- N°1 Load pump diesel 110m3/h out 5,5Kg/cm2
- N°5 Load pumps RCR 110m3/h out 5,5Kg/cm2
- N°2 Unload pumps gasolin 30m3/h out 4,5Kg/cm2
- N°2 Unload pumps kero 20m3/h out 5,5Kg/cm2
- N°2 Unload pumps gasoil 20m3/h out 6/cm2
- N°1 Unload pump diesel 50m3/h out 5Kg/cm2
- N°1 Unload pump benzene 50m3/h out 5Kg/cm2
- N°2 Potable water pumps 15m3/h out 4Kg/cm2
- N°1 Potable water pumps 18m3/h out 4Kg/cm2
- N°1 Fire water pump 160m3/h out 12Kg/cm2
- DCS ABB AC800F
- N°19 Loading bay
- N°8 Unloading points
2008TECNOELETTRA BAHRAINBOILER REFURBISHMENTEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP OF BOILERCONTROL & ON/OFF VALVES
2008SCOP - MINISTRY OF OIL IRAQMETERING SYSTEM
(GAS MEASURAMENT AND REDUCTION SKIDS)
EP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR :
- N°2 of 26” 600RF meters with meter prover and motorized valves
- Meter type : turbine of 12”
- PLC Panasonic
- HMI Movicon
- Flow Computer Omni Flow 6000
- Flow rate: 1390 m3/h
2008SCOP - MINISTRY OF OIL IRAQPS3 PUMPING STATIONEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP OF DCS & ESD CONTROL SYSTEM AND INSTRUMENTS FOR REHABILITATION:
- DCS ABB AC800F
- ESD HIMA SYSTEM
2008SCOP - MINISTRY OF OIL IRAQLOADING & UNLOADING ARMS SYSTEMEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR:
- N°8 Pumps 150 m3/h out 4 Kg/cm2
- N°1 Main fire fighting pump 375 m3/h
- N°1 Jockey fire fighting pump 50 m3/h
- N°4 Loading bay 6” / Unloading points 4”
- N°1 Slop Tank
2007RAFFINERIE DI ROMA ITALYSTEAM GENERATIONSUPPLY OF:
- BMS Interlock system
- DCS Distributed control system
- Local panel
2007SCOP - MINISTRY OF OIL IRAQSUPPLY FOR HAWIJA PROJECTEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR:
- Electrical cabinets, HV & LV
- MCC Cabinets
- Control and instrumentation panels
- Manual and automatic valves
- Water filters
- Additive skids
- Installation materials
2006AIR LIQUIDE ITALIA SERVICE FOR E.N.E.AITALYSYNGAS ZECOMIX / BAGITEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START :
- Skid
- Pressure transmitters
- Flow transmitters
- Orifice plate
- Check valve
- Safety valve
- Junction boxes
- Manifold, fittings, cable
- PLC
- Control panel
- Valves on/off
- Engineering
2006TECHNIP KTI ITALYLURGI PETRONAS HEATERSEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR n° 3 BURNER SKIDS AND OFF SKIDS MATERIALS:
- Skid & material off-skid
- Control valves
- On-off valves
- Burner piping
- Transmitters
- Compression fittings, flanges, tubing
- Control panel
2006SCOP - MINISTRY OF OIL IRAQCHEMICAL FEED SYSTEM AND BLOWERSEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR WATER INJECTION PROJECT
2005TECHNIP KTI ITALYHYDROCRACKER COMPLEXEP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR FIRING MEASURAMENT SKID:
- Firing & Measuring Skids with BMS
- Engineering
- Pressure gauges
- Pressure transmitters
- Self-regulating valves
- Rotameters
- Local panel
- Junction boxes
- Valve on-off
- Engineering
2005TECHNIP KTI ITALYFIRING SKID EP CONTRACT WITH ASSISTANCE TO COMMISSIONING AND START UP FOR FIRING SKID WITH PLC CONTROL SYSTEM:
- Engineering
- Firing skid
- BMS
- Pressure transmitters
- Pressure gauges
- ON/OFF Valves
- Control valves
- Self regulating valves
- BMS
- Flow transmitters
- Local panel
- PLC
- Cable
- Fittings